Go Green color polymer slurry mixture is pre-mixed (manually paved). It is made of high-grade colored emulsified asphalt, colored composite graded aggregate, environmentally friendly weather-resistant pigments, and various additives through a fully automated production line. With low VOC content, and has excellent hydrophobicity, aging resistance and comprehensive mechanical properties, which can reduce the absorption of solar heat radiation by the road surface, effectively reduce the aging problem of the asphalt layer, slow down the urban heat island effect, and prolong the road service life, beautify the urban environment, standardize traffic order, and meet various road use requirements.
Application
It is suitable for non-motorized vehicle lanes with irregular areas, steep road bends and frequent multi-color changes, such as sidewalks, boulevards, bicycle paths in commerical areas, school playgrounds, park tracks etc.
Construction
Surface treatment
Remove floating soil and dust from the surface of the asphalt substrate, and clean it up, the surface of the concrete substrate should be finely milled to remove the floating slurry, so that the surface has a structural depth of 2-3mm, then use a blower to clean up the dust; Apply tape around the construction area, the interface agent is sprayed on the clean concrete substrate after milling, and the interface agent is dried for 30 minutes before the next process. The dosage of the interface agent is 0.2kg/m2;
Preparations
The color polymer slurry mixture is two components, the main agent:curing agent = 25:1, according to this dosage and specified proportions, the curing agent is poured into the main agent, and the polymer is stirred for 30 seconds; After the slurry mixture is prepared, use it up within 1 hour, otherwise the gel will be scrapped.
Coating
Measure the surface temperature, the surface temperature must be lower than 45℃
Carry out the first time of coating and scraping of the color polymer slurry mixture, and after 3 hours of drying, carry out the second time of coating and scraping;
Coating parameters: Scrape twice the amount: 3.5kg/m2;
After the construction is completed, it needs to be maintained for 4-12 hours (depending on the temperature), and then open to traffic;
Attention
Construction cannot be carried out in rainy days; The color polymer slurry mixture should be stored in a cool place, and it is forbidden to expose to the sun;
Technical Index
Application
It is suitable for non-motorized vehicle lanes with irregular areas, steep road bends and frequent multi-color changes, such as sidewalks, boulevards, bicycle paths in commerical areas, school playgrounds, park tracks etc.
25kg/bucket
Storage temperature: 5℃-35℃
Shelf life unopen: 6 months