Go Green recycled asphalt additive is a kind of single component asphalt recycling agent, it's a high molecular polymer refined by special naphthene base crude oil. Go Green asphalt recycling agent uses a unique reverse order of dewaxing process that could make the recycling agent free of wax and low pour point. Therefore compared with other recycling agent asphalt mixture, the renewable recycling  agent has a better low temperature performance and adhesion properties, also has  excellent natural solvency, easy penetration, fusion and has a good combination with reclaimed asphalt mixtures, no need to add any solvent. It is special designed for reclaimed asphalt mixtures (RAP).


Product Advantages


  • Superior Performance

    Go Green regenerate technology improve the utilization ratio on hot mixing plant recycling solution, and solve the hot recycling mixture quality and construction problems. By adjusting the aged asphalt components to make the aged asphalt  performance recover effectively, the asphalt flexibility and cohesiveness will basically reach the new asphalt level, thus  greatly enhance the recycled asphalt mixture high and low temperature performance, water damage resistance and  fatigue durability, then effectively improve the recycled asphalt mixture road performance.


  • Save Cost

    Go Green regenerate technology improve the RAP utilization ratio, accomplish 50% even 100% RAP utilization, it save  much cost on the new asphalt and new aggregate, greatly reduce the manufacturing cost, thus reduce the project cost.


  • Energy Saving and Environmental Protection

    Go Green regenerate technology improve the RAP utilization ratio, achieve the cyclic utilization on waste materials, reduce  the raw material (asphalt, aggregate) consumption and land occupation, in the meanwhile, it avoids the quarrying destruction to ore and forest.


Construction Procedure


Transport the recycled asphalt additive to asphalt mixing plant, after crushing and screening, mix with a certain proportion of new  aggregate, new asphalt and asphalt recycling agent, by through the hot mix plant recycling method to produce out the hot asphalt mixture, then finished the construction with asphalt paver and roller compaction.


Recycled Asphalt Additive


Usage Method and Precaution


  1. Go Green recycled asphalt additive specific dosage is determined by the amount of RAP added and the aging  degree of asphalt


  2. RAP heating temperature: base asphalt RAP heating temperature should be controlled at 120~140℃, modified  asphalt RAP heating temperature should be controlled at 130~150℃.


  3. New aggregate heating temperature should be controlled at 180~190℃, base asphalt heating temperature is  155~165℃.


  4. Asphalt recycling agent heating temperature is 50~80℃.


  5. Adding sequence: adding the new aggregate into mixing tank firstly, then put the RAP and spray the asphalt  recycling agent, to ensure the good performance, the asphalt recycling agent should be sprayed on the RAP  feeding curtain, dry mixing 15s, finally spray the asphalt, mixing with the mineral powder uniformly.



Technical Index


Recycled Asphalt Additive

Recycled Asphalt Additive



Go Green recycling agent is a kind of liquid product, it’s incorporating into hot in-place recycling or hot mix plant recycling, can restore and effectively improve aged asphalt pavement performance and extend the life of asphalt pavement.

200kg per drum, 4 drums on a pallet, total 80 drums in a 20ft container 

Online Inquiry

Kindly fill up the inquiry form, we will deal with your inquiry within 24 hours.

Product Name: Recycled Asphalt Additive

Name:
Country:
Company:
E-mail:
Tel.:
Your Message:
CAPTCHA:

Online Inquiry

Kindly fill up the inquiry form, we will deal with your inquiry within 24 hours.

Product Name: Recycled Asphalt Additive

Name:
Country:
Company:
E-mail:
Tel.:
Website:
Your Message:
CAPTCHA:
Contact Us
  • Go Green Industrial (Shanghai) Co.,Ltd.
  • Phone: +86 21 6105 3027 / 6100 9307
  • Mobile: +86 159 0079 5274
  • Fax: +86 21 5187 6819
  • E-mail: sales@go-green.com.cn
  • Add: 12th Floor, YongYe Mansion. No.2240 South Pudong Road, Pudong New District. Shanghai, China 200127